2023-03-27
The representatives and experts who participated in the completion acceptance of the project believed after inspection and deliberation of the project site and relevant materials: the construction of the domestic waste incineration power generation project conforms to the national basic construction procedures; the entire project has completed the contents of the preliminary design approval; the engineering design and layout Reasonable; the safety, quality, progress and investment control of the project construction are well controlled; the fire protection, environmental protection, file management, safety and occupational disease protection facilities, water and soil conservation facilities, etc. of the project have all passed the special inspection and acceptance, and the domestic waste incineration power generation project has passed the completion inspection.